When Telok Ayer Street Was the Beach: Singapore's First Land Reclamations
When the Thian Hock Keng temple was built on Telok Ayer Street between 1839 and 1842, it stood on the beach. Sailors landing from China came up from the water to give thanks to Mazu, the goddess of the sea, for a safe crossing. By the end of the century it was four streets from the sea, and today the water is further away still. The land in front of it was made by the colonial government, which levelled hills, built seawalls and filled in the bay.
![]()
Collyer Quay around 1890. The seawall and the road behind it were built on reclaimed land and finished in 1864. (Photo: unknown photographer, KITLV/Leiden University Library, public domain, via Wikimedia Commons)
The first fill, 1822
Singapore’s reclamation began three years after the British arrived. The south bank of the Singapore River was low and swampy, and in 1822 Stamford Raffles had a small hill near today’s Battery Road levelled and its earth used to fill the swamp. About 300 labourers did the work in roughly four months. The new ground became Boat Quay along the river and Commercial Square, later Raffles Place, the centre of the town’s trade.
Along the coast to the south, Telok Ayer Street, whose Malay name means “water bay”, followed the shoreline. The Nagore Dargah shrine, built between 1828 and 1830, and the Al-Abrar Mosque, which began as a thatched hut in 1827, faced the sea along with Thian Hock Keng.
![]()
Lieutenant Philip Jackson’s plan of the town, drawn in 1822. (Image: Lieutenant Philip Jackson, public domain, via Wikimedia Commons)
A seawall for the merchants, 1864
The next stretch was the waterfront east of Commercial Square, where the merchants’ offices and warehouses backed onto the sea. From the late 1850s a seawall was built from Fort Fullerton south towards the Telok Ayer Market, and the ground behind it was filled to make a road along the water. The work was done by Indian convict labour, and it went slowly. According to the National Library Board’s history of reclamation, the foundations could only be laid at the lowest tides, which came about once a fortnight, so the wall took three years and the road another year. It was finished in 1864 and named Collyer Quay after George Chancellor Collyer, the Chief Engineer of the Straits Settlements.
![]()
Collyer Quay in 1890, in a Photochrom print. (Image: Photoglob Co., public domain, via Wikimedia Commons)
Telok Ayer, 1879–1897
Where the shoreline moved, shown on today’s map. Use the buttons to step through each stage. The areas are approximate, traced against Jackson’s 1822 plan, the 1893 city plan and a 1951 town map. (Map data © OpenStreetMap contributors)
The largest project of the century came next. Between 1879 and 1897 the Public Works Department reclaimed a 42-acre strip of the bay in front of Telok Ayer Street, using earth from Mount Wallich and part of Mount Palmer, two hills to the south that were blasted away for the purpose. The first stretch, as far as Cecil Street, was finished by 1886, and on the new land the department laid out Cecil Street, Robinson Road and Raffles Quay along the new seafront. The roads linked the commercial district with the docks at Tanjong Pagar. In April 1881, the Singapore Daily Times wrote that beside the Telok Ayer works, “the Collyer Quay reclamation sinks into utter insignificance”.
The old Telok Ayer Market, which had stood on the shore at the end of Market Street since the 1820s, was pulled down in 1879 as the reclamation began. Its replacement, designed by the municipal engineer James MacRitchie with cast-iron work made in Glasgow, was built on the new land between 1890 and 1894. That building survives today as Lau Pa Sat.
Did it pay?
Page 309 of the weekly Singapore Free Press of 17 November 1896, which printed the cost of the Telok Ayer reclamation and the money raised by selling the land. (Singapore Free Press and Mercantile Advertiser, via NewspaperSG, National Library Board Singapore, public domain)
In November 1896, at the request of a member of the Legislative Council, the government published what the Telok Ayer reclamation had cost and what it had earned. According to the statement, printed in the Singapore Free Press, $917,243 had been spent on the work between 1879 and 1896, and it had produced 1,808,028 square feet of land. About 88,000 square feet had gone to Finlayson Green and the new market. The government had sold 653,028 square feet at an average of $1.13 a square foot, bringing in $739,481, and more than a million square feet were still available for sale or held in reserve. The statement put the cost of reclamation at 51 cents a square foot, so the land was selling for more than twice what it had cost to make.
![]()
Cecil Street around 1910, one of the streets laid out on the Telok Ayer reclamation. (Photo: Carl Josef Kleingrothe, KITLV/Leiden University Library, public domain, via Wikimedia Commons)
The basin that sank, 1893–1932
The Telok Ayer waterfront on a 1913 map, with the unfinished seawall of the basin reclamation offshore. (Image: Fraser and Neave, 1913, public domain, via Wikimedia Commons)
Even before the Telok Ayer works were finished, a second, larger scheme began further out. Started in 1893, it was meant to reclaim 88 acres behind a 5,000-foot seawall. In 1910 engineers found that the seawall was sinking, and work was suspended with 65 acres reclaimed and 4,120 feet of wall built, leaving a gap of 880 feet. The unfinished section was turned into a tidal basin for small vessels, the Telok Ayer Basin. Work resumed in 1930 and was completed in 1932, by which time the cost had risen from 2.5 million to 15 million Straits dollars. A road built along the new land, Raffles Way, was renamed Shenton Way in 1951.
After 1965
Singapore’s land area, 1960–2025
Square kilometres at the end of each year, offshore islands included; the axis starts at 550 km². Hover or tap for each year.
Source: Singapore Land Authority, Total Land Area of Singapore (data.gov.sg).
View as table (every fifth year)
| Year | Land area (km²) |
|---|---|
| 1960 | 581.5 |
| 1965 | 581.5 |
| 1970 | 586.4 |
| 1975 | 596.8 |
| 1980 | 617.8 |
| 1985 | 620.5 |
| 1990 | 633.0 |
| 1995 | 647.5 |
| 2000 | 682.7 |
| 2005 | 697.9 |
| 2010 | 712.4 |
| 2015 | 719.1 |
| 2020 | 728.3 |
| 2025 | 744.3 |
According to the National Library Board’s account, all the reclamation of the colonial period added about 3 square kilometres to Singapore. Between 1965 and 2015, the country reclaimed about 138 square kilometres more, at Changi, along the East Coast, on Jurong Island, at Tuas and around the river mouth. The Telok Ayer Basin itself was filled in between 1974 and 1977, and the land beyond the old waterfront became Marina Bay. According to the Singapore Land Authority, the country’s land area grew from 581.5 square kilometres in 1960 to 744.3 square kilometres at the end of 2025.
![]()
Marina Bay at dusk in 2018. All of the land around the bay was reclaimed after 1965. (Photo: Benh LIEU SONG, CC BY-SA 4.0, via Wikimedia Commons)
What comes next
Two confirmed projects will move the shoreline again. At Tuas, the Maritime and Port Authority is building a new port in four phases on reclaimed land. The first phase of reclamation was completed in 2021, and when all four phases are finished in the 2040s the port will cover about 1,337 hectares and handle up to 65 million twenty-foot container units a year.
Off the East Coast, the Urban Redevelopment Authority is planning “Long Island”, which could reclaim more than 800 hectares, about twice the size of Marina Bay, to protect the low-lying coast from rising sea levels, create a new reservoir and provide land for future development. As described when it was announced in November 2023, the concept is three long tracts of land from Marina East to Tanah Merah, with the new reservoir between them and East Coast Park, and a tidal gate and pumping station between each pair of tracts. As of its update in March 2026, the plans were still being worked out through technical studies, and reclamation will begin only after those studies are complete.
“Long Island” as described when it was announced: three tracts of about 800 hectares in all, with a reservoir behind them. This is an illustration drawn for this post, not an official plan; the layout is approximate and the design is still being studied. (Map by Lesser Known Singapore; map data © OpenStreetMap contributors)
See more historical photos and maps related to this post →
Where it fits in the bigger story: Much of downtown Singapore stands on ground that was once the bay. The shoreline has been moving since 1822, first with hills carried to the sea and seawalls built at low tide, and the old waterfront streets like Telok Ayer Street still trace where the beach used to be.
Sources
- Land From Sand: Singapore’s Reclamation Story, BiblioAsia (National Library Board)
- Collyer Quay, Infopedia (National Library Board)
- Shenton Way, Infopedia (National Library Board)
- Telok Ayer: Bayfront Worship, Roots.gov.sg (National Heritage Board)
- Former Telok Ayer Market (now known as Lau Pa Sat), Roots.gov.sg (National Heritage Board)
- “The Telok Ayer Reclamation”, Singapore Free Press (weekly edition), 17 November 1896, page 309, NewspaperSG
- “The Telok Ayer Reclamation Works”, Singapore Daily Times, 13 April 1881, NewspaperSG
- Total Land Area of Singapore, Singapore Land Authority (data.gov.sg)
- Port of the Future, Maritime and Port Authority of Singapore
- Update on the ‘Long Island’ project, Urban Redevelopment Authority, 30 March 2026
- ‘Long Island’, Urban Redevelopment Authority
- Waterfront homes, reservoir, parks: Reclamation off East Coast to create Long Island preferred over building sea wall, AsiaOne
- Map data © OpenStreetMap contributors (openstreetmap.org/copyright)
- File:KITLV - 103744 - Collyer Quay in Singapore - circa 1890.tif, Wikimedia Commons
- File:KITLV - 103742 - Lambert & Co. - Thian Hock Keng Temple in Singapore - circa 1890.tif, Wikimedia Commons
- File:Plan of the Town of Singapore (1822) by Lieutenant Philip Jackson original.jpg, Wikimedia Commons
- File:Singapore. Collyer Quai LCCN2017657654.jpg, Wikimedia Commons
- File:KITLV - 79924 - Kleingrothe, C.J. - Medan - Cecil Street, Singapore - circa 1910.tif, Wikimedia Commons
- File:Telok Ayer Singapore 1913.png, Wikimedia Commons
- File:Singapore Marina Bay Dusk 2018-02-27.jpg, Wikimedia Commons
- File:Plan map of the City of Singapore of British Malaya, from the Constable’s Hand Atlas of India (1893).jpg, Wikimedia Commons
- File:Map of Singapore City in 1951.png, Wikimedia Commons
- File:KITLV - 377460 - Collyer quay in Singapore - circa 1890.tif, Wikimedia Commons (gallery)
- File:KITLV - 79887 - Kleingrothe, C.J. - Medan - Collyer Quay, Quay in Singapore - circa 1910.tif, Wikimedia Commons (gallery)
- File:KITLV - 79888 - Kleingrothe, C.J. - Medan - Square at Singapore - circa 1910.tif, Wikimedia Commons (gallery)
- File:KITLV - 79894 - Kleingrothe, C.J. - Medan - Finlayson Green at Singapore - circa 1910.tif, Wikimedia Commons (gallery)
- File:Moskee te Singapore, vermoedelijk de Nagore Durgha Shrine aan Telok Ayer Street, KITLV 104803.tiff, Wikimedia Commons (gallery)
- File:Gebouwen langs de kade in de haven van Singapore, KITLV 29186.tiff, Wikimedia Commons (gallery)
- File:Kade te Singapore, KITLV 104787.tiff, Wikimedia Commons (gallery)
- File:Singapore. Boven Tandjong Pagar. Linksonder Collyer Quay. Rechtsonder Exchang, Bestanddeelnr 844 05.jpg, Wikimedia Commons (gallery)
- File:Built in 1894 as a market, with cast-iron supports. it’s a hawker centre now (Singapore version of a food court) (8235341079).jpg, Wikimedia Commons (gallery)
- File:Telok Ayer Singapore 1932.png, Wikimedia Commons (gallery)